Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21PA0197

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PA0197","CONCRETING OF JUNCTION TUQUIB VIA PALAYAN-TAMAC FARM TO MARKET ROAD, TAMAC, VILLAVCIOSA, ABRA","Roads","Completed",40793000,0,100,"Abra DEO","Cordillera Administrative Region","A.D. MARRERO GENERAL CONSTRUCTION (32448)","2021-07-22","2021-12-16",2021,"Outside Infra - GAA 2021 DA FMR",17.36392,120.64259,"1400127000","1400100000"]
SHA-256
71b0f55a154a07cf207b7b0515ab833b4b84be01fa55a8c5334ba745692bb68d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.