Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21PA0238

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PA0238","CONSTRUCTION OF UPPER CARDONA FLOOD CONTROL, DOLORES, ABRA","Flood Control and Drainage","Completed",96497900,0,100,"Abra DEO","Cordillera Administrative Region","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2021-12-28","2022-02-14",2021,"Regular Infra - GAA 2021 LP",17.66865,120.70545,"1400107000","1400100000"]
SHA-256
db3eb9f20baef2b3f8c1ed3a4b116ec32de640af18cdc451bc263d295912b960

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.