Project 21PB0013
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PB0013","FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF NABUANGAN RIVER (UPSTREAM) FLOOD CONTROL, STA.38+997 - STA.39+447 (B/S), BRGY. CAGLAYAN, CONNER, APAYAO","Flood Control and Drainage","Completed",80309010.27,0,100,"Apayao 1st DEO","Cordillera Administrative Region","ASC CONSTRUCTION & CONCRETE PRODUCTS (26788)","2021-12-22","2023-04-14",2021,"Regular Infra - GAA 2021 OO-2",17.79907,121.30772,"1408102000","1408100000"]
SHA-256
515e6076e3bf3054cb9a0b13b51fd7eae3118907838f050849f42a682f49e85aHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.