Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21PI0034

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PI0034","CONSTRUCTION OF ATO FLOOD CONTROL, STA. 31+360 - STA. 31+440 (L.S.) ALONG CHICO RIVER, BONTOC, MOUNTAIN PROVINCE","Flood Control and Drainage","Completed",13743524.94,0,100,"Mountain Province 1st DEO","Cordillera Administrative Region","JBA CONSTRUCTION AND BUILDERS (36321)","2021-03-10","2021-10-02",2021,"Regular Infra - GAA 2021 OO-2",17.07042,120.98887,"1404404000","1404400000"]
SHA-256
26506ecc2a55117a8de40f8706d1fa3aa0f412d6dbf15444467fdf898930c718

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.