Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21PK0035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PK0035","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF DALAYAP FLOOD CONTROL STA. 149+300 - STA. 149+325 (B.S.),","Flood Control and Drainage","Completed",2816343.9,0,100,"Upper Kalinga DEO","Cordillera Administrative Region","SALTAN RIVER CORPORATION (48044)","2022-03-24","2022-10-24",2021,"Regular Infra - GAA 2021 OO-2",17.50204,121.19194,"1403201000","1403200000"]
SHA-256
21d39d3239174f8235a75351435ee4ca5f052c92f42dbed9d75ab8b6e4be88a5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.