Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21Z00020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21Z00020","CONTRACT PACKAGE 5, SLOPE PROTECTION (MARAWI-BITO ROAD) UPPER AND LOWER SLOPES; TR-28: REHABILITATION OF ROAD ALONG MARAWI - BITO ROAD; AND TR-29: REHABILITATION OF LASURECO ROAD","GAA 2019 FAPs","On-Going",200600000,0,46.31,"Roads Management Cluster II (Multilateral)","Central Office","KOUZBARY BUILDERS (36446) / M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP. (32195)","2023-08-22",null,2019,"Regular Infra - GAA 2019 FAPs",8.01748,122.28257,"907223000","907200000"]
SHA-256
09e55ab5cfbacfe0647752afa9b9813f1232954c7108f4e13367989b84d4f72e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.