Project 22A00171
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22A00171","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE ALONG PAYAS CREEK, BRGY. SAN MARCOS, SAN NICOLAS, ILOCOS NORTE","Flood Control and Drainage","Completed",96499999.74,0,100,"Region I","Region I","MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY (38288)","2022-04-12","2022-10-18",2022,"Regular Infra - GAA 2022 OO-2",18.16716,120.57482,"102812000","102800000"]
SHA-256
71df28a8ccae1d0a479c4abdfdf9653a990e7279ad5be868ec86ecc056fb2cc7Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.