Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22A00252

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22A00252","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER, RIGHT BANK, LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT, BRGY. POBLACION, SITIO BOL","Flood Control and Drainage","Completed",96499990.96,0,100,"Region I","Region I","ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)","2022-04-07","2023-01-10",2022,"Regular Infra - GAA 2022 OO-2",17.90099,120.66042,"102814000","102800000"]
SHA-256
c30c2802711cb044beb0bc1614136d413ebb02259384a3d2059ac74700820527

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.