Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22A00260

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22A00260","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN AT BARANGAYS BUCAO WEST, BUCAO EAST, LANTAG, BARITAO AND TARANGOTON","Flood Control and Drainage","Completed",241248185.79,0,100,"Region I","Region I","A.P.B. CONSTRUCTION (17055) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2022-04-07","2023-02-28",2022,"Regular Infra - GAA 2022 OO-2",16.9116,120.46187,"102933000","102900000"]
SHA-256
8049a0a064dd8f57c01e326d5fa4ef4c0001bff9c2aaa7f79eedd38fc09b6283

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.