Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22A00273

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22A00273","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER, LEFT BANK, LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT, BRGY. POBLACION, SITIO SINA","Flood Control and Drainage","Completed",96499962.97,0,100,"Region I","Region I","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2022-04-07","2023-01-06",2022,"Regular Infra - GAA 2022 OO-2",17.89299,120.66217,"102814000","102800000"]
SHA-256
a975e97144a913ef70b19e16702e5c43a465f5b2143241ad90d451f6d8e987c2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.