Project 22A00283
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22A00283","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LAOAG RIVER BASIN AND SABO FLOOD CONTROL STRUCTURE ALONG DONGDONG RIVER (RIGHT BANK), BARANGAY ACNAM, SIT","Flood Control and Drainage","Completed",48249996.92,0,100,"Region I","Region I","ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)","2022-11-03","2023-03-15",2022,"Regular Infra - GAA 2022 OO-2",17.92466,120.6905,"102814000","102800000"]
SHA-256
4111ea8c748989ce0431c4a62470fefb722fa4dabb2c625c38a0e8c349e7c95dHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.