Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22AA0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22AA0022","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG VINTAR-BACARRA RIVER (BISLAK RIVER), BRGY. ALSEM, SITIO PUNGTO, VINTAR, ILOCOS NORTE","Flood Control and Drainage","Completed",24499630.63,0,100,"Ilocos Norte 1st DEO","Region I","JCA CONSTRUCTION AND CONSTRUCTION SUPPLY (39026)","2022-02-08","2022-04-13",2022,"Regular Infra - GAA 2022 CSSP",18.28802,120.70611,"102823000","102800000"]
SHA-256
793235d31db1210933aad8606948b4c09ec3df9c021671d9390973209c337461

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.