Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22AD0045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22AD0045","CONSTRUCTION OF BAYBAYABAS FLOOD CONTROL, BRGY. BAYBAYABAS, SANTIAGO, ILOCOS SUR","Flood Control and Drainage","Completed",4897213.84,0,100,"Ilocos Sur 2nd DEO","Region I","FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. (11645)","2022-02-24","2023-01-30",2022,"Regular Infra - GAA 2022 CSSP",17.22684,120.45431,"102906000","102900000"]
SHA-256
0784b82a66fb74655d4d1be41c573d928b8989250505631a65e3d68a4e6c4fed

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.