Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22AD0088

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22AD0088","CONSTRUCTION OF OAIG DAYA FLOOD CONTROL, CANDON CITY, ILOCOS SUR","Flood Control and Drainage","Completed",9505903.16,0,100,"Ilocos Sur 2nd DEO","Region I","FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. (11645)","2022-04-04","2023-01-31",2022,"Regular Infra - GAA 2022 CSSP",17.17943,120.45763,"102906000","102900000"]
SHA-256
00b53b344739d8f40f609ec4436e39fa6d4a0f10d0a623524dc90c9d1f1f54d8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.