Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22AF0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22AF0012","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAUANG RIVER BASIN, STA 0+000-STA 0+900, BRGY. NATIVIDAD, NAG., LU","Flood Control and Drainage","Completed",45020399.68,0,100,"La Union 2nd DEO","Region I","VILLAR GENERAL CONSTRUCTION AND SUPPLIES (22540)","2022-02-16","2022-08-15",2022,"Regular Infra - GAA 2022 OO-2",16.52835,120.38588,"103311000","103300000"]
SHA-256
d9624873b488db1f00047a3d4111b9da5c3eb1d91e6a077cda9700e96288d91e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.