Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22AI0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22AI0022","CONSTRUCTION OF PEDESTRIAN OVERPASS, URDANETA, PANGASINAN","Roads","Completed",19305044.38,0,100,"Pangasinan 3rd DEO","Region I","KEVIN PAUL CONSTRUCTION (49090)","2022-03-07","2023-04-10",2022,"Regular Infra - GAA 2022 CSSP",15.97093,120.57173,"105546000","105500000"]
SHA-256
7e01c310ebe19409191488bbca6beabff66bc83145c95382e6484db8a576455c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.