Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22AI0106

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22AI0106","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CABULANDAYAN RIVER, BRGY. SAN EUGENIO, NATIVIDAD, PANGASINAN","Flood Control and Drainage","Completed",29390746.66,0,100,"Pangasinan 3rd DEO","Region I","RIVBROS CONSTRUCTION FACTORS & DEVELOPMENT (28504)","2022-02-24","2022-11-30",2022,"Regular Infra - GAA 2022 OO-2",16.06658,120.79271,"105536000","105500000"]
SHA-256
7cee45566e867604e8c8799aeca3f8f45639fbf810a87d99125cb26f55072005

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.