Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22BC0118

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22BC0118","ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MANILA NORTH RD-K0650+927-K0651+000, K0655+579-K0655+728, K0655+751-K0656+938, K0656+961-K0657+000, PAMPLONA,CAGAYAN","Roads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",42943120,0,100,"Cagayan 2nd DEO","Region II","MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION) (34354)","2022-03-29","2023-10-25",2022,"Regular Infra - Roads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",18.42037,121.36763,"201518000","201500000"]
SHA-256
af3b1e3d3926b964ac46a8cccee2722119ea4ccdbc7bcf787bdf64f9d65d2c1b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.