Project 22BD0096
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22BD0096","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF DRAINAGE SYSTEM ALONG PALLUA, TUGUEGARAO CITY, CAGAYAN - PHASE I","Flood Control and Drainage","Completed",24125000,0,100,"Cagayan 3rd DEO","Region II","JTM CONSTRUCTION (41136)","2022-03-28","2023-07-03",2022,"Regular Infra - GAA 2022 OO-2",17.62514,121.69922,"201529000","201500000"]
SHA-256
ed76776967de4e989f7c13377314cc7b2cdf53fe6005ff16c6474a1d50ae91dcHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.