Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22BE0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22BE0018","CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH CHANNELIZATION OF WATERWAY ALONG AGGUB-SAN JUAN CREEK, CABAGAN, ISABELA","Flood Control and Drainage","Completed",14799986.51,0,100,"Isabela 1st DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2022-02-15","2022-08-27",2022,"Regular Infra - GAA 2022 CSSP",17.411,121.73666,"203106000","203100000"]
SHA-256
31863213febc921139c0bb8e8b359eea45460365b5ebc10bb16ff537a04603ad

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.