["dpwh","22BF0025","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (SITIO PAKAK SECTION)BRGY. NUESA, ROXAS, ISABELA","Flood Control and Drainage","Completed",41655583.57,0,100,"Isabela 2nd DEO","Region II","RRC CO. INC. (FORMERLY: R R C CONSTRUCTION) (24369)","2022-03-16","2022-08-21",2022,"Regular Infra - GAA 2022 CSSP",17.13075,121.60722,"203126000","203100000"]
SHA-256
5fc0c4a9dc65bb681b55c2966aae0775b80ca4ebb0caa70b918b73da12aa2a25