Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22BG0087

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22BG0087","OO2 - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS -  CONSTRUCTION OF RIVER FLOOD CONTROL STRUCTURES, BRGY. DICABISAGAN WEST (AIRPORT), PALANAN, ISABELA","Flood Control and Drainage","Completed",46307660.7,0,100,"Isabela 3rd DEO","Region II","CAMBERWELL CONSTRUCTION AND SUPPLIES (39624) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2022-04-13","2023-12-15",2022,"Regular Infra - GAA 2022 OO-2",17.05982,122.42876,"203121000","203100000"]
SHA-256
3fc779053413aab77f0c8dca5ec4fbb16d56f2b65af5faa6634ea6b3d7bd994d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.