Project 22BJ0043
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22BJ0043","BASIC INFRASTRUCTURE PROGRAM-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES CONSTRUCTION OF CUTAR FLOOD CONTROL STRUCTURE ALONG STA. FE RIVER, CUTAR, ARITAO, NUEVA VIZCAYA","Flood Control and Drainage","Completed",48296850.24,0,100,"Nueva Vizcaya 2nd DEO","Region II","AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)","2022-03-24","2022-11-15",2022,"Regular Infra - GAA 2022 CSSP",16.28701,121.03006,"205002000","205000000"]
SHA-256
5509042d60c713bbf84ccec5bb1a8a8308974b7afadd80590cde033e26c7e752Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.