Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CA0071

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CA0071","BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PENTOR, BALSIK RIVER, BALSIK SECTION PHASE ATR-1HERMOSA, BATAAN","Flood Control and Drainage","Completed",39599984.38,0,100,"Bataan 1st DEO","Region III","TRICHES CONSTRUCTION & TRADING (33876)","2022-06-07","2022-12-09",2022,"Regular Infra - GAA 2022 CSSP",14.87144,120.47427,"300804000","300800000"]
SHA-256
52d75bc0e560dd144b045ce2a8a4053f8613bd12141b8809a3230e27ac6037d1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.