Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CC0096

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CC0096","CONSTRUCTION OF SLOPE PROTECTION STRUCTURES AT GUIGUINTO RIVER (BAGBAG CREEK, STA. 0+000 - STA. 0+780), BARANGAY MALIS, GUIGUINTO, BULACAN","Flood Control and Drainage","Completed",45079451.15,0,100,"Bulacan 1st DEO","Region III","A.R.L. CONSTRUCTION (27645)","2022-01-28","2022-10-24",2022,"Regular Infra - GAA 2022 CSSP",14.84,120.87494,"301408000","301400000"]
SHA-256
8b4546d061e6f8287f298490bf2a6fd6b7ce36a73da114b377bb9be43b5792fa

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.