Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CC0217

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CC0217","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BRGY. PANGINAY, PHASE I, BALAGTAS, BULACAN","Flood Control and Drainage","Completed",45079937.65,0,100,"Bulacan 1st DEO","Region III","JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)","2022-03-04","2022-05-18",2022,"Regular Infra - GAA 2022 CSSP",14.80746,120.89844,"301402000","301400000"]
SHA-256
005ffa41ccb17ee8292bef87d722e52ccb3d2c76fe7b2f230dc023aba60a780e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.