Project 22CC0232

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CC0232","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER (PHASE 2), BARANGAY MALIBONG, PANDI, BULACAN","Flood Control and Drainage","Completed",59396408.04,0,100,"Bulacan 1st DEO","Region III","TOPNOTCH CATALYST BUILDERS INC. (34061)","2022-03-07","2022-11-01",2022,"Regular Infra - GAA 2022 CSSP",14.83505,120.92522,"301415000","301400000"]