Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CD0003

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CD0003","CONSTRUCTION OF FLOOD CONTROL STRUCTURE (RING DIKE) ALONG PINAGKABALIHAN RIVER, STA. 01+741.00 STA. 02+140.20, OBANDO, BULACAN","Flood Control and Drainage","Completed",92639455.74,0,100,"Bulacan 2nd DEO","Region III","AZUL BUILDERS (21870)","2022-03-07","2022-09-05",2022,"Regular Infra - GAA 2022 OO-2",14.70063,120.93231,"1380400000","1307500000"]
SHA-256
56e001e127de0b158aba5803f3780026b95c3d94e74123df784506f2b620d4f9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.