Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CD0045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CD0045","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MAASIM RIVER SALAPUNGAN SECTION PHASE II, SAN RAFAEL, BULACAN","Flood Control and Drainage","Completed",54124446.67,0,100,"Bulacan 2nd DEO","Region III","EIRISH BUILDERS & SUPPLY INC. (33656)","2022-03-07","2022-10-05",2022,"Regular Infra - GAA 2022 OO-2",15.0274,120.96666,"301419000","301400000"]
SHA-256
80a0dddb2073b8bdd326dac4d8d2d2b51b654dab68f77aa3aa0c076ee8081e22

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.