Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CD0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CD0051","CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT DILIMAN 1ST, MABALAS-BALAS CREEK DILIMAN 1ST, SAN RAFAEL, BULACAN","Flood Control and Drainage","Completed",54124555.25,0,100,"Bulacan 2nd DEO","Region III","EIRISH BUILDERS & SUPPLY INC. (33656)","2022-03-07","2022-10-05",2022,"Regular Infra - GAA 2022 OO-2",15.02196,120.94763,"301422000","301400000"]
SHA-256
f7c493daf760e95c181d3d3e21eb079e09f7ecb960d7ddd3ff178fe583bb87a9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.