Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CD0086

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CD0086","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MEYCAUAYAN RIVER (LIPUTAN-NAGBALON), STA. 04+000  STA. 04+400, MEYCAUAYAN, BULACAN","Flood Control and Drainage","Completed",96498187.66,0,100,"Bulacan 2nd DEO","Region III","L.R. TIQUI BUILDERS, INC. (13810)","2022-06-09","2023-07-14",2022,"Regular Infra - GAA 2022 CSSP",14.73839,120.92519,"301412000","301400000"]
SHA-256
e860960366726ff8bc40e263b4f80900124ff8e4c798ed35ad22b16494ae3360

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.