Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CD0191

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CD0191","CONSTRUCTION OF FLOOD CONTROL STRUCRURE (SLOPE PROTECTION), BRGY. BAHAY PARE, MEYCAUAYAN CITY, BULACAN","Flood Control and Drainage","Completed",9899947.57,0,100,"Bulacan 2nd DEO","Region III","TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)","2022-03-30","2022-06-25",2022,"Regular Infra - GAA 2022 CSSP",14.77238,121.02164,"301412000","301400000"]
SHA-256
295b80283caf8247bcc0ea4d4122ec3e3c66d7937df107a5aecd07f0f584d916

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.