Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CE0029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CE0029","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BRGY. PANTOC, ALIAGA, NUEVA ECIJA","Flood Control and Drainage","Completed",45080000,0,100,"Nueva Ecija 1st DEO","Region III","AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)","2022-02-04","2022-08-02",2022,"Regular Infra - GAA 2022 OO-2",15.5299,120.84954,"304922000","304900000"]
SHA-256
c1869c4742dff46d44d0fb0732168979c4ab239a92f901595d9fabe9195f8b2e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.