Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CJ0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CJ0005","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAMILING RIVER LEFT BANK, BACABAC SECTION (PHASE IV-2), CAMILING, TARLAC","Flood Control and Drainage","Completed",28767900.51,0,100,"Tarlac DEO","Region III","GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS) (18286)","2022-02-14","2022-07-23",2022,"Regular Infra - GAA 2022 CSSP",15.72616,120.43018,"306903000","306900000"]
SHA-256
b39b4bf39aa822817d72e2ca59ed26dfa7fa752a623aba4658818bb0e1546d4b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.