Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CJ0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CJ0018","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER LEFT BANK (PHASE II), CAYAOAN SECTION, CAYAOAN, CAMILING, TARL","Flood Control and Drainage","Completed",28782600.04,0,100,"Tarlac DEO","Region III","GJE BUILDERS CORPORATION (FORMERLY: GJE BUILDERS) (18286)","2022-02-14","2022-07-24",2022,"Regular Infra - GAA 2022 OO-2",15.70197,120.4146,"306903000","306900000"]
SHA-256
c12a71f3557dd977679be1d1560dff3021e458394e2b2e9275441f94b26d6f11

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.