["dpwh","22CJ0022","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION ALONG CAMILING RIVER RIGHT BANK, SURGUI 1ST SECTION, SURGUI 1ST, CAMILING, TARLAC","Flood Control and Drainage","Completed",43210090.76,0,100,"Tarlac DEO","Region III","R.R. RICAFORT CONSTRUCTION AND SUPPLIES (14402)","2022-01-28","2022-07-22",2022,"Regular Infra - GAA 2022 CSSP",15.68281,120.41039,"306903000","306900000"]