FY2026 GAA: ₱6.79T
PisoScan

Project 22CJ0118

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CJ0118","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF DRAINAGE OUTFALL FOR ROMULO HIGHWAY (PHASE 2), CAMILING, TARLAC","Flood Control and Drainage","Completed",19219599.55,0,100,"Tarlac DEO","Region III","CS GONZALES CONSTRUCTION AND SUPPLY (42328)","2022-02-14","2022-07-14",2022,"Regular Infra - GAA 2022 OO-2",15.68865,120.41099,"306903000","306900000"]
SHA-256
c826082265cc09a989f3675ab039a4f4e9083f362aaa283f32a7436ea9d1d758

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.