Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CJ0172

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CJ0172","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF CAMILING-AGNO RIVER FLOODWAY PHASE 2, TARLAC","Flood Control and Drainage","Completed",94473500,0,100,"Tarlac DEO","Region III","ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. (09036)","2022-03-30","2023-03-28",2022,"Regular Infra - GAA 2022 CSSP",15.75152,120.42563,"105511000","105500000"]
SHA-256
69535c499c9eb49b44417230612634ad4989ff2eb163e65d6553fcd97c5109ae

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.