Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CL0016

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CL0016","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUISGUIS-MANGATAREM BRIDGE 2, SANTA CRUZ, ZAMBALES","Flood Control and Drainage","Completed",47041910.07,0,100,"Zambales 1st DEO","Region III","STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)","2022-03-03","2022-09-11",2022,"Regular Infra - GAA 2022 CSSP",15.7715,120.05798,"307113000","307100000"]
SHA-256
557364e9085aa5cd1a2d97cfce079f4ca480481cd110c95b15960db23fceeedd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.