Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CM0063

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CM0063","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF FLOOD MITIGATION AND DRAINAGE SYSTEM OF CAMACHILE RIVER (UPSTREAM), STA. 19+964 - STA. 20+129, CASTILLEJOS, ZAMBALES","Flood Control and Drainage","Completed",77199999.95,0,100,"Zambales 2nd DEO","Region III","ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) (05349)","2022-03-24","2022-08-22",2022,"Regular Infra - GAA 2022 OO-2",14.95313,120.19192,"307104000","307100000"]
SHA-256
483124f00bd8c8efe7b1bc6d442e2b1d7c24f84423b07b88c0b30730775135b4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.