Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CN0029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CN0029","REHABILITATION OF DUONGAN RIVER CONTROL, BALER, AURORA","Flood Control and Drainage","Completed",90880300.31,0,100,"Aurora DEO","Region III","BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION) (8292) / R.N.G.M. CONSTRUCTION CORPORATION (FORMERLY: R.N.G.M.  CONSTRUCTION) (20281)","2022-02-28","2022-11-25",2022,"Regular Infra - GAA 2022 OO-2",15.75973,121.56569,"307701000","307700000"]
SHA-256
35945413546994ce318e4858a68bcb33420778aa67ffcf404b2436b88af1e2da

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.