Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22DD0067

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22DD0067","CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER (PHASE 3), BARANGAY LIPAH","Flood Control and Drainage","Completed",70198191.76,0,100,"Batangas 4th DEO","Region IV-A","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2022-02-25","2022-10-31",2022,"Regular Infra - GAA 2022 CSSP",13.84558,121.39614,"405648000","405600000"]
SHA-256
c20e1594a2dc97e2d1fbf7e4dcb6b3b2cd706cc5ee5b0efcb5789dcf3b6d3735

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.