Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22DF0135

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22DF0135","CONVERGENCE AND SPECIAL SUPPORT PROGRAM  BASIC INFRASTRUCTURE PROGRAM (BIP),BIP  MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES  CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 2, BARANGAY PASONG KAWAYAN II, GENERAL TRIAS CITY, CAVITE","GAA 2022 CSSP","On-Going",4949759.34,0,0,"Cavite 1st DEO","Region IV-A","ELIJENRAE BUILDERS AND CONSTRUCTION SUPPLY (FORMERLY: ELIJENRAE BUILDERS) (33366)","2022-03-06",null,2022,"Regular Infra - GAA 2022 CSSP",14.33683,120.88146,"402108000","402100000"]
SHA-256
1519b86d6a1d271ff71846a78761d1f5dfb4f1920dfd7eecbcc61c086f03f14a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.