Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22DN0104

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22DN0104","REHABILITATION OF FLOOD CONTROL STRUCTURE, BRGY. MAMBUGAN, BRGY. STA. CRUZ AND BRGY. DELA PAZ ANTIPOLO CITY (FIRST DISTRICT)","Flood Control and Drainage","On-Going",72374961.66,0,80.2,"Rizal 1st DEO","Region IV-A","A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL (22265) / BELL CONSTRUCTION (27851)","2022-06-02",null,2022,"Regular Infra - GAA 2022 OO-2",14.60045,121.15212,"405802000","405800000"]
SHA-256
1a25d1baadf88640c3225d3599fea304270d4471afd4e1ced38e891fea0cdddd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.