Project 22E00145
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22E00145","CLUSTER 1: CONSTRUCTION OF FLOOD CONTROL STRUCTURES IN MAGDIWANG ROMBLON, 1.1-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-CONST. OF DANAO F/C STRUC. (PHASE 2), 1.2-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-CONST. OF ITURALBA F/C STRUC.","GAA 2022 CSSP","Completed",48136031.05,0,100,"MIMAROPA Region","MIMAROPA Region","ASHLEYKA CONSTRUCTION AND SUPPLIES CORP. (FORMERLY: ASHLEYKA CONSTRUCTION AND SUPPLIES) (41140)","2022-10-11","2023-07-31",2022,"Regular Infra - GAA 2022 CSSP",12.48205,122.45738,"1705908000","1705900000"]
SHA-256
78e0a2fa80f3f166bd45876a5b325174ac1b342dbe557e3d908c39894974b295Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.