Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22E00151

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22E00151","CONSTRUCTION OF RIVER CONTROL STRUCTURE AND DRAINAGE SYSTEM, CAMBAJAO RIVER CONTROL, SIBUYAN ISLAND, ROMBLON (PHASE 2), STA. 00+000-STA. 00+420 (R/S); STA. 0+279-STA. 0+420 (L/S), SIBUYAN, ROMBLON","GAA 2022 CSSP","Completed",106137741.38,0,100,"MIMAROPA Region","MIMAROPA Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2022-03-24","2023-08-31",2022,"Regular Infra - GAA 2022 CSSP",12.36504,122.6738,"1705903000","1705900000"]
SHA-256
44a92335133be474d3b02835e6400c2aec2166efe2e31517982a5b594a39c1f6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.