Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22EA0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22EA0021","CONSTRUCTION OF TUGOS FLOOD CONTROL, BARANGAY TUGOS, BOAC, MARINDUQUE","GAA 2022 CSSP","Completed",6721284.1,0,100,"Marinduque DEO","MIMAROPA Region","SAMARAH CONSTRUCTION AND SUPPLY (47174)","2022-02-16","2022-05-10",2022,"Regular Infra - GAA 2022 CSSP",13.38139,121.85853,"1704001000","1704000000"]
SHA-256
fddd2f5d39908b3756d1aae0ba692ba81b4e9677a4f3fc4c2c3a657b530450ec

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.