Project 22EH0017

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22EH0017","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUDIONG RIVER (PHASE 2), STA. 0+870.00 - STA. 1+100 (R/S), ODIONGAN, ROMBLON","GAA 2022 CSSP","Completed",41886289.12,0,100,"Romblon DEO","MIMAROPA Region","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2022-02-23","2022-08-01",2022,"Regular Infra - GAA 2022 CSSP",12.39377,121.97671,"1705909000","1705900000"]
SHA-256
18fa601c7ddc34a8509d74347413d3e14b7ec2b5dc8bb2ba998e00d42bece93a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.