Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22EH0113

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22EH0113","CONSTRUCTION OF JUN CARLO, FLOOD CONTROL STRUCTURE (UPSTREAM), STA. 00+000 - STA. 00+149.20, SAN ANDRES, ROMBLON","GAA 2022 OO-2","Completed",24500000,0,100,"Romblon DEO","MIMAROPA Region","ATHENA CONSTRUCTION AND DEVELOPMENT (37750)","2022-06-20","2022-12-15",2022,"Regular Infra - GAA 2022 OO-2",12.52711,122.03561,"1705912000","1705900000"]
SHA-256
168bff7c27d865188758ca64b99e748597dff296135c3f75bbaeb8d4d86dc4e7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.