Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22EH0150

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22EH0150","CONSTRUCTION OF  LEVEL III PUBLIC WATER SUPPLY SYSTEM, ROMBLON, ROMBLON","GAA 2022 CSSP","Completed",48995243.91,0,100,"Romblon DEO","MIMAROPA Region","B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) (9687)","2022-07-06","2023-10-30",2022,"Regular Infra - GAA 2022 CSSP",12.51699,122.28255,"1705910000","1705900000"]
SHA-256
1abea8d109baef6863c2b59cb614a7e267e11449d1ed282a654632b80838e45b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.